[click image to enlarge]
This is the Center For Technical Education being gutted before the wrecking ball arrives for demolition. Construction of the new high school has moved into its final Phase 3. This phase consists of the demolition of the existing Center For Technical Education and the construction of the new 3-story 224,000 SF gymnasium, auditorium, and administration wing which is scheduled to be completed by August, 2010.
The amazing thing about this project is that it was planned in phases so that there would be minimal disruption to the students' education. The school has remained fully operational since this project began in 2007.
Quincy (Kwin' zee), Massachusetts, City of Presidents and Birthplace of the American Dream
Monday, March 30, 2009
Subscribe to:
Post Comments (Atom)
Summer Attraction
This tiger swallowtail butterfly was a delight to see pollinating the phlox bed along my driveway.
-
This tiger swallowtail butterfly was a delight to see pollinating the phlox bed along my driveway.
-
This beautiful Gothic and Tudor Revival style building was built in 1891 as a school for children of the granite workers in West Quincy; it ...
-
The administration building is all that remains of Quincy City Hospital. It will be renovated and incorporated into a multi-family 465-unit...
2 comments:
I'm glad they're thinking this through. I wonder what the plans are for all the building debris. And whether the new building they're putting up will be green.
Good planning is rare!
Post a Comment